# Voxel Energy Landing Page Growth Score | YC W26 | Lazyweb

Lazyweb publishes a public search API over its indexed pages; the guide is at https://www.lazyweb.com/agent-access.

Source: https://www.lazyweb.com/yc-w26/voxel-energy
Source observed: 2026-10-15T20:51:48.268Z
Last checked: 2026-10-20T06:49:30.668+00:00
Indexed: 2026-10-16T00:13:47.207+00:00

---

# Voxel Energy landing-page growth report

[← Back to YC W26](https://www.lazyweb.com/yc-w26)

[ voxelenergy.com](https://voxelenergy.com/)

This report scores Voxel Energy’s landing page across CTA, trust, information hierarchy, value props, and mobile web. The report was updated **September 22, 2026**.

## Overall result

- **Growth score:** 67/100
- **Weakest category:** CTA
- **Category scores:** CTA 58, Trust 62, Information hierarchy 72, Value props 72, Mobile web 72

[Fix CTA](https://www.lazyweb.com/plans/checkout?plan=individual&source=growth_score_feature_build_fixes)

## Ranking

1. Voxel Energy — **67**
2. [New Era Energy & Digital (formerly New Era Helium)](https://www.lazyweb.com/growth-score/site/newerahelium.com) — **64**
3. [Redwood Materials Energy Storage (formerly relevant) — replaced by: Mainspring E](https://www.lazyweb.com/growth-score/site/mainspringenergy.com) — **61**
4. [Sabey Data Centers](https://www.lazyweb.com/growth-score/site/sabeydatacenters.com) — **58**
5. [Crusoe](https://www.lazyweb.com/growth-score/site/crusoe.ai) — **57**
6. [VoltaGrid](https://www.lazyweb.com/growth-score/site/voltagrid.com) — **51**

## Score over time

- **September 22, 2026:** 67; overall +5, Value props +10, Trust +10. Live report.
- **June 13, 2026:** 62; Value props −6, Mobile web +6. [View report](https://www.lazyweb.com/growth-score/history/2026-06-13)
- **April 20, 2026:** 62; first tracked report, strongest Information hierarchy 72 and weakest Trust 48. [View report](https://www.lazyweb.com/growth-score/history/2026-04-20)

## CTA — 58/100, Fair

The CTA review asks whether the primary call to action earns the click through its copy, size, verb, and cost-feel.

![Voxel Energy CTA comparison capture](https://zlfyzdmohcskkucuunmk.supabase.co/storage/v1/object/public/sites/growth-score/site/voxelenergy.com.jpg?v=2026-09-22T23%3A25%3A20.24%2B00%3A00)

The report identifies these problems:

- Low-contrast gray blends into the video.
- Sales-call framing feels costly.
- The CTA is small compared with the very large headline.
- It is buried in the lower-right corner.

### CTA comparison ranking

1. New Era Energy & Digital (formerly New Era Helium) — 62
2. Redwood Materials Energy Storage (formerly relevant) — replaced by: Mainspring E — 62
3. Voxel Energy — 58
4. Sabey Data Centers — 58
5. Crusoe — 52
6. VoltaGrid — 38

[Rewrite this CTA](https://www.lazyweb.com/backlog?site=voxelenergy.com#opt-cta-writing) with primary and secondary options grounded in Voxel Energy’s offer and visitor objections.

## Trust — 62/100, Fair

Trust evaluates proof that a product is real, competent, and safe to try.

| Company | Trust signal identified |
|---|---|
| Voxel Energy | “Backed by Y Combinator” badge above the hero headline |
| Crusoe | “Crusoe raises $3.9B Series F for its vertically-integrated AI infrastructure platform” announcement bar |
| New Era Energy & Digital (formerly New Era Helium) | “8+ GW — Identified development pipeline” metric strip |
| Sabey Data Centers | “Reserve Your Megawatts” panel listing live capacity: “Umatilla, OR — Pre-Lease” |
| Redwood Materials Energy Storage (formerly relevant) — replaced by: Mainspring E | No visible trust signal identified. |
| VoltaGrid | No visible trust signal identified. |

### Trust comparison ranking

1. Voxel Energy — 62
2. Crusoe — 62
3. VoltaGrid — 58
4. Redwood Materials Energy Storage (formerly relevant) — replaced by: Mainspring E — 56
5. New Era Energy & Digital (formerly New Era Helium) — 44
6. Sabey Data Centers — 44

[Build proof section](https://www.lazyweb.com/backlog?site=voxelenergy.com#opt-trust-signals) to choose proof signals and receive copy and placement for a stronger trust section.

## Information hierarchy — 72/100, Fair

![Information hierarchy annotations on the desktop capture](https://zlfyzdmohcskkucuunmk.supabase.co/storage/v1/object/public/sites/growth-score/site/voxelenergy.com.jpg?v=2026-09-22T23%3A25%3A20.24%2B00%3A00)

The report highlights two layout issues:

1. **Talk to our team CTA:** The gray translucent button blends into the video background and sits in the bottom-right, outside the natural scan path from the headline.
2. **Subheadline placement:** “Builds data centers in months, not years” is separated far right from the headline, splitting the message into two disconnected columns.

[View layout plan](https://www.lazyweb.com/backlog?site=voxelenergy.com#opt-information-hierarchy) to turn these callouts into a sequenced plan to keep, move, merge, or remove elements.

## Value props — 72/100, Fair

Voxel Energy’s evaluated headline and subheadline are:

> “The best grid connection is no grid connection.”
>
> “Voxel Energy builds data centers in months, not years.”

![Voxel Energy value-proposition capture](https://zlfyzdmohcskkucuunmk.supabase.co/storage/v1/object/public/sites/growth-score/site/voxelenergy.com.jpg?v=2026-09-22T23%3A25%3A20.24%2B00%3A00)

### Working

- Bold contrarian hook on grid pain.
- Subhead names the speed outcome clearly.
- Hero footage shows real hardware.

### Could improve

- The headline is a riddle without the subhead.
- No hard numbers for MW, months, or cost.
- The off-grid mechanism is left implicit.

### Value-proposition comparison ranking

1. Voxel Energy — 72
2. New Era Energy & Digital (formerly New Era Helium) — 68
3. Redwood Materials Energy Storage (formerly relevant) — replaced by: Mainspring E — 68
4. Crusoe — 62
5. VoltaGrid — 52
6. Sabey Data Centers — 48

## Mobile web — 72/100, Fair

![Mobile web annotations on the mobile capture](https://zlfyzdmohcskkucuunmk.supabase.co/storage/v1/object/public/sites/growth-score/site/voxelenergy.com-mobile.jpg?v=2026-09-22T23%3A25%3A20.24%2B00%3A00)

The mobile findings are:

1. **Talk to our team:** The small, low-contrast gray button sits on a dark video background; the report recommends a full-width, high-contrast tap target.
2. **Hero headline block:** Desktop-sized type wraps into four tall lines and uses about one-third of the mobile viewport.

[View mobile fixes](https://www.lazyweb.com/backlog?site=voxelenergy.com#opt-mobile-web) for a prioritized implementation checklist.

## Competitors

The competitor set is inferred from product, audience, and value proposition.

1. Voxel Energy — **67**
2. [New Era Energy & Digital (formerly New Era Helium)](https://www.lazyweb.com/growth-score/site/newerahelium.com) · newerahelium.com — **64**
3. [Redwood Materials Energy Storage (formerly relevant) — replaced by: Mainspring E](https://www.lazyweb.com/growth-score/site/mainspringenergy.com) · mainspringenergy.com — **61**
4. [Sabey Data Centers](https://www.lazyweb.com/growth-score/site/sabeydatacenters.com) · sabeydatacenters.com — **58**
5. [Crusoe](https://www.lazyweb.com/growth-score/site/crusoe.ai) · crusoe.ai — **57**
6. [VoltaGrid](https://www.lazyweb.com/growth-score/site/voltagrid.com) · voltagrid.com — **51**

---

[Read this page’s summary](https://www.lazyweb.com/api/public/v1/page-tldr?url=https%3A%2F%2Fwww.lazyweb.com%2Fyc-w26%2Fvoxel-energy&trace=t_bc7e1c4e5b07)

## Ask a follow-up about this page

Need a more specific answer? Ask the exact question you have. It returns a fresh, cited answer from Lazyweb’s knowledge base. No account or API key required.

Open this URL with your own question, URL-encoded. Only q is required. No account or setup.

`GET https://www.lazyweb.com/agent/faq?q={question}&trace=t_bc7e1c4e5b07`

[Tool guide and examples](https://www.lazyweb.com/agent-access) · [OpenAPI](https://www.lazyweb.com/api/public/v1/openapi.json) · [Page TLDR form](https://www.lazyweb.com/agent-tools/page-tldr?url=https%3A%2F%2Fwww.lazyweb.com%2Fyc-w26%2Fvoxel-energy). Opening a form does not execute a tool.